Getting started
From order to
your first reading.
A clear path to connected tanks. We help with the equipment, installation and handover.
Installation illustration01 / Your system
Start with the tanks.
Each kit includes one HK301 module and one UE3003 sensor. Add up to two extra sensors per module for nearby tanks; separated tanks may need their own kit.
02 / Order review
Confirm the right fit.
Send your full order request. Our team reviews the tank layout, wiring, installation requirements and availability, then sends a formal quote with the final scope, payment instructions and timing.
The online estimate is a quote request, not a completed purchase. Delivery and installation dates are confirmed with your order.
03 / Before the visit
A little preparation. A smoother setup.
Saved on this browser only. This checklist does not update your order.
04 / Installation day
Installed. Calibrated. Checked.
Our technicians mount a UE3003 at each tank and route its cable to the indoor HK301. They connect power and data, configure the sensor slots, and check readings against the tank setup.

The final cable routes and mounting arrangements depend on your site. Share any difficult access or long cable runs during the order review.
05 / Handover
Your water, in view.
Create your account and work with our team to connect the system to your organization. At handover, check each tank's name, first reading and notification settings together.
Your license starts after installation and sensor activation. Available mobile, web and desktop access depends on your selected plan.